Thus we connect — read only
The value comes fromModbus TCP · Plant PLC · M-Bus (meters)of the installation —read, not checked. Everything isin the housecalculated, nothing leaves the house. No obligation to disclose operating data.
Your own LLM for BHKW — offline
Questions in plain language, answered byYour own installation data— local, no cloud. The AI runs internally; the installation remains yours.
Regulatory framework:IEC 60364 / CEB standards / CEB LV connection / 4110 (grid connection) · DIN EN 60034 (alternator)
Associated causal chains
This component is part ofInstallation causal chains— from cause to effect (gas quality → engine → exhaust gas → heat → efficiency). The AI reads the entire chain, not just the individual value.
Link with the entire installation
A BHKW is never alone: electricity, heat and gas are linked, and with PV and battery storage, it becomes a system. The AI calculates the entire installation.
Frequently asked questions
What is active power in a BHKW?
Active power indicates the electrical power actually produced in kW and differs from apparent power (kVA) by the power factor.
Why does active power fluctuate during operation?
Fluctuations can be caused by variations in gas composition, changes in ambient temperature or load adjustments in the control system.
From what point is a deviation in active power critical?
A significant and lasting deviation from the setpoint (P-Soll) indicates problems with the fuel or mechanical faults in the engine.
How does gas quality influence active power?
A decrease in the heating value of the gas leads, at a constant injection quantity, to a measurable reduction in electrical active power.
Why is active power important for maintenance?
It serves as an indicator for engine health; trends in kW values often signal wear processes several weeks before a total failure.
How is active power used for control?
Power control compares the actual value of the active power with the setpoint and adjusts the injection quantities as well as the air supply accordingly.