Thus we connect — read-only
The value comes fromModbus TCP · Plant PLC · M-Bus (meters)of the installation —read, not controlled. Everything isin the housecalculated, nothing leaves the house. No obligation to disclose operational data.
Your own LLM for BHKW — offline
Questions in plain language, answered byYour own installation data— local, no cloud. The AI runs internally; the installation remains yours.
Regulatory framework:IEC 60364 / CEB standards / CEB LV connection / 4110 (grid connection) · DIN EN 60034 (alternator)
Associated causal chains
This component is part ofInstallation causal chains— from cause to effect (gas quality → engine → exhaust gas → heat → efficiency). The AI reads the entire chain, not just the individual value.
Link with the entire installation
A BHKW is never alone: electricity, heat and gas are linked, and with PV and battery storage, it becomes a system. The AI calculates the entire installation.
Frequently Asked Questions
What happens in case of faulty grid synchronization?
Faulty synchronization leads to massive short-circuit currents that can damage the windings and mechanical components of the BHKW generator.
Which values must match for a BHKW injection?
The voltage, frequency (target value 50,0 Hz) and phase shift of the generator must exactly match the grid connection parameters.
Why is the measurement of frequency so important for the BHKW?
The frequency must be stable at 50,0 Hz, as deviations prevent synchronization and lead to an immediate shutdown by the protection relays.
From when is a grid synchronization considered successful?
Synchronization is considered successful if the differences in voltage, frequency and phase are below the limits set by the grid operator.
How is the phase shift controlled for the BHKW?
The phase shift is adjusted via a synchronizer or the integrated control system of the BHKW to ensure that the generator is coupled to the grid at the correct time.
What role does short-circuit current play during commissioning?
Short-circuit current is the result of faulty synchronization; it must be avoided by precise control in order to protect the installation from destruction.