Thus we connect — read-only
The value comes fromModbus TCP · Plant PLC · M-Bus (meters)of the installation —read, not controlled. Everything isin the housecalculated, nothing leaves the house. No obligation to disclose operational data.
Your own LLM for BHKW — offline
Questions in common language, answered byYour own installation data— local, no cloud. The AI runs internally; the installation remains yours.
Regulatory framework:IEC 60364 / CEB standards / LV connection by CEB / 4110 (grid connection) · DIN EN 60034 (alternator)
Associated causal chains
This component is part ofInstallation causal chains— from cause to effect (gas quality → engine → exhaust gas → heat → efficiency). The AI reads the entire chain, not just the individual value.
Link with the entire installation
A BHKW is never alone: electricity, heat and gas are linked, and with PV and battery storage, it becomes a system. The AI calculates the entire installation.
Frequently Asked Questions
What is the function of grid protection in the BHKW?
Grid protection monitors voltage and frequency and disconnects the BHKW from the grid in less than 200 ms in case of exceeding limits.
From what point does the grid protection disconnect the BHKW?
Disconnection occurs in case of undervoltage below 85% or overvoltage above 110%, as well as in case of frequency deviations outside the range of 49.8 Hz to 50.2 Hz.
Why is the disconnection time of 200 ms so important?
This period of time ensures that the BHKW does not create an island formation in case of a grid failure and avoids interactions with the public grid.
How does the protection protect the BHKW equipment?
Thanks to immediate disconnection in case of incorrect voltages, the power electronics and the generator windings are protected against electrical overvoltages.
What happens if the grid protection fails?
Without a functioning grid protection, damage to components due to unstable grid parameters and the risk of an uncontrolled island formation threaten the installation.
Which measured values are critical for grid protection?
The primary parameters are voltage (V) and frequency (Hz), which ensure injection stability.