Thus we connect — read-only
The value comes fromModbus TCP · Plant PLC · M-Bus (meters)of the installation —read, not controlled. Everything isin the housecalculated, nothing leaves the house. No obligation to disclose operational data.
Your own LLM for BHKW — offline
Questions in plain language, answered byYour own installation data— local, no cloud. The AI runs internally; the installation remains yours.
Regulatory framework:purchase obligation (OA) / remuneration supplement (CR) 2023 · VDI 4608 (energy assessment)
Associated causal chains
This component is part ofInstallation causal chains— from cause to effect (gas quality → engine → exhaust gas → heat → efficiency). The AI reads the entire chain, not just the individual value.
Link with the entire installation
A BHKW is never alone: electricity, heat and gas are linked, and with PV and battery storage, it becomes a system. The AI calculates the entire installation.
Frequently asked questions
What is the most important factor for the profitability of a BHKW?
The temporal correlation between electricity and heat demand as well as a high number of full-load hours are decisive.
From when is a BHKW economically profitable?
A BHKW is profitable if the synergy between electricity and heat production exceeds the costs of individual supply of electricity and heat.
What is the effect of purchase obligation (OA) / remuneration supplement (CR) premiums for the BHKW?
Purchase obligation (OA) / remuneration supplement (CR) premiums are state subsidies that improve profitability when using biomass or natural gas in a BHKW.
How do fuel costs influence profitability?
Advantageous fuels such as biogas from clean production reduce marginal costs and accelerate the payback period.
Why is the number of full-load hours so important?
A high number of full-load hours means that the BHKW operates more often at its optimal operating point and that investment costs are amortized faster.
How is the profitability of a BHKW calculated?
The calculation is performed by comparing grid fees and energy costs saved against the operating costs of the BHKW.