Thus we connect — read-only
The value comes fromModbus TCP · CAN (BMS) · PCSfrom the installation —read, not controlled. Everything isin-housecalculated, nothing leaves the house. No obligation to disclose operational data.
Your own BESS LLM — offline
Questions in plain language, answered byYour own installation data— local, no cloud. The AI runs internally; the installation remains yours.
Regulatory framework:IEC 62477
Connection with the entire installation
Storage only reveals its value within the system: with PV, load peaks, and electricity prices. The AI plans storage in relation to the entire installation.
Frequently Asked Questions
What is a precharge circuit in a BESS?
A circuit with a resistor and a switch, which gradually builds up the voltage to the inverter capacitors.
Why is the precharge circuit important for safety?
It limits the inrush current and prevents inductive voltage spikes from destroying semiconductor components.
How to identify a fault in the precharge circuit?
An incomplete voltage rise or an excessively high current flow through the precharge resistor indicates a malfunction.
From when must the precharge circuit be maintained?
Monitoring the time behavior during the voltage rise serves as an indicator of capacitor degradation.
What role does it play in profitability (Rentability)?
A functional precharge circuit protects expensive power electronics modules and minimizes downtime in service.
Is the precharge circuit an active or passive component?
It is composed of passive components (resistor, capacitor) and often an active switch to control the process.