Thus we connect — read-only
The value comes fromModbus TCP · CAN (BMS) · PCSfrom the installation —read, not controlled. Everything isin-housecalculated, nothing leaves the house. No obligation to disclose operational data.
Your own BESS LLM — offline
Questions in plain language, answered byYour own installation data— local, no cloud. The AI runs internally; the installation remains yours.
Regulatory framework:IEC 62477
Connection with the entire installation
Storage only reveals its value within the system: with PV, load peaks, and electricity prices. The AI plans storage in relation to the entire installation.
Frequently Asked Questions
What is a power conversion system (PCS) in a BESS?
A Power Conversion System (PCS) converts the direct current (DC) from battery storage into alternating current (AC) and controls the injection.
How does the PCS influence the profitability of a battery?
The PCS determines, through its efficiency and regulation algorithms, what quantity of energy is actually available or can be injected.
Why is the measured value p_chg_dis important?
The value p_chg_dis indicates the current charging or discharging current and serves as the basis for calculating the state of charge (SoC) and degradation.
From what point does profitability decrease due to a poor PCS configuration?
If high conversion losses or control errors lead to unnecessary cycles, the BESS capacity decreases faster than expected.
How can the lifespan of a BESS be extended?
Thanks to precise power module control, extreme load peaks are avoided and the optimal state of charge is maintained.
Which standard governs the safety of power electronics in storage systems?
IEC 62477 defines the safety requirements for high-voltage electronics in battery storage systems.