Thus we connect — read-only
The value comes fromModbus TCP · CAN (BMS) · PCSfrom the installation —read, not controlled. Everything isin-housecalculated, nothing leaves the house. No obligation to disclose operational data.
Your own BESS LLM — offline
Questions in plain language, answered byYour own installation data— local, no cloud. The AI runs internally; the installation remains yours.
Regulatory framework:IEC 60364 / CEB standards / CEB connection conditions
Connection with the entire installation
Storage only reveals its value within the system: with PV, load peaks, and electricity prices. The AI plans storage relative to the entire installation.
Frequently Asked Questions
What is the grid connection point for a BESS?
It is the location where the battery energy storage system is connected to the public electricity grid and where the measurement of active and reactive power takes place.
Why is this point important for profitability?
Only an accurate entry of the power injected at the connection point allows for the correct billing of balancing services and arbitrage gains.
Which standard governs the grid connection point?
In Germany, the IEC 60364 / CEB standards / CEB connection conditions are primarily relevant for technical requirements regarding the injection of production installations.
From when must a BESS be measured at the connection point?
Measurement is mandatory from commissioning and for operation in regulated mode, in order to guarantee grid stability.
How does the voltage at the connection point influence the injection?
Exceeding the permitted voltage ranges can lead to an automatic reduction of the power injected by the BESS inverter.
Can a fault at the connection point cause failures?
Technical faults or configuration errors at this point result in the immediate shutdown of the system by the protection relays.