Thus we connect — read-only
The value comes fromModbus TCP · CAN (BMS) · PCSfrom the installation —read, not controlled. Everything isin-housecalculated, nothing leaves the house. No obligation to disclose operational data.
Your own BESS LLM — offline
Questions in plain language, answered byYour own installation data— local, without cloud. The AI runs internally; the installation remains yours.
Regulatory framework:IEC 60364 / CEB standards / CEB connection conditions
Link with the entire installation
Storage only reveals its value within the system: with PV, load peaks and electricity prices. The AI plans storage in relation to the entire installation.
Frequently Asked Questions
What is Q/U protection in a BESS?
It is a protection function in the grid protection relay that monitors reactive power (Q) and voltage (U) to ensure compliance with grid parameters.
Why is the grid protection relay important for profitability?
A correctly configured relay prevents disconnections by the grid operator in case of exceeding limits, thus maximizing injection time and therefore turnover.
Which standard governs Q/U protection in battery storage systems?
The primary technical reference for connecting BESS to the public grid is IEC 60364 / CEB standards / CEB connection conditions.
From when is a BESS disconnected due to poor Q/U values?
Disconnection is performed automatically by the protection relay as soon as measured values exceed the limits defined for grid operation according to IEC 60364 / CEB standards / CEB connection conditions.
How does reactive power influence injection?
Reactive power is necessary for voltage regulation on the grid; insufficient or excessively high reactive power leads to the withdrawal of the injection authorization.
Can a faulty protection relay reduce profitability?
Yes, because malfunctions or overly conservative settings lead to unnecessary disconnections, preventing the system from injecting energy.