Thus we connect — read-only
The value comes fromModbus TCP · CAN (BMS) · PCSof the installation —read, not controlled. Everything isin the housecalculated, nothing leaves the house. No obligation to disclose operational data.
Your own LLM BESS — offline
Questions in plain language, answered byYour own installation data— local, no cloud. The AI runs internally; the installation remains yours.
Regulatory framework:IEC 62933-2-1
Connection with the entire installation
Storage only reveals its value within the system: with PV, load peaks and electricity prices. The AI plans storage in relation to the entire installation.
Frequently Asked Questions
What is maximum charging power for a BESS?
It indicates the maximum electrical power that the system can absorb during the charging process (measured in kW or MW).
Why is the p_max_charge value important?
This register provides the real-time measured value to verify if the installation is using its full technical capacity for energy absorption.
How does maximum charging power influence profitability?
Higher charging power allows more surplus energy to be stored in less time, increasing the use of arbitrage opportunities.
At what point is a maximum charging power that is too low critical?
If the charging power is lower than typical photovoltaic injection, an insufficient amount of energy can be stored, leading to unused surplus.
How is maximum charging power defined according to the IEC 62933-2-1 standard?
It is defined as a technical limit for the power electronics to ensure component protection and grid stability.
Can high maximum charging power reduce lifespan?
Continuous operation at maximum can cause thermal stress; consequently, the charging curve is generally controlled within the BESS specifications.