Thus we connect — read only
The value comes fromModbus TCP · CAN (BMS) · PCSfrom the installation —read, not controlled. Everything isin-housecalculated, nothing leaves the house. No obligation to disclose operational data.
Your own BESS LLM — offline
Questions in plain language, answered byYour own installation data— local, no cloud. The AI runs internally; the installation remains yours.
Regulatory framework:IEC 62619
Connection with the entire installation
Storage only reveals its value within the system: with PV, load peaks and electricity prices. The AI plans storage in relation to the entire installation.
Frequently Asked Questions
What is the benefit of monitoring the cell_v register?
The register provides the live measured value of the cell voltage to immediately detect imbalances in the BESS.
Why is individual cell monitoring according to the IEC 62619 standard important?
The standard requires safety measures against thermal runaway and ensures that cells are operated within their specifications.
What is the impact of a cell imbalance on profitability?
Imbalances lead to premature shutdown of the entire BESS, as the weakest cell limits the process.
From what point is a cell status critical?
Significant voltage deviations from the average value indicate increased internal resistance or defects.
How can the lifespan of a BESS be extended?
Thanks to uniform charging and discharging of all cells, chemical aging is distributed evenly.
Why is a BESS economically advantageous for solar installations?
It allows storing surplus electricity and injecting it during periods of high demand or in case of grid congestion.